
| Feature | Side-Drive PCP | Boremax Direct Drive |
|---|---|---|
| Mechanical Setup | ||
| Moving Parts | ||
| Install Time | ||
| Energy Use | ||
| Tough Wells | ||
| Well Types | ||
| Downtime |

No Pulley
No gearbox
Fewer moving parts

High-sand wells
High-viscosity wells
Heavy-duty operation

50% lower energy use
Installation in under 2 hours
6+ months zero downtime

Horizontal wells
Inclined wells
Coalbed methane
Offshore & mountain wells

Technical Specifications
Built to replace side-drive PCP setups on standard wellhead configurations
*Specifications shown are representative placeholder values and subject to change pending final engineering documentation.
Boremax leases and supports the system for operators across the United States. The underlying design has an operating history across multiple international basins, including high-sand and high-viscosity fields in Asia and evaluation programs with major operators, before being brought to the U.S. lease market.
(214) 555-0142
1900 N. Akard St, Dallas, TX 75201
© 2026 Boremax. All Rights Reserved.