Installation & Training

Complete on-site installation, system commissioning, and operator training delivered by Boremax field engineers.

Included with Every Installation:

  • Boremax Direct Drive Main Unit, configured to your required power specification

  • Pre-configured Control Cabinet

  • 15 meters of heavy-duty power cable

  • Export-ready packaging for safe transportation

Standard lead time is approximately 3 months. Equipment is supplied FOB from the designated port of origin.

BOREMAX

What Happens On-Site:

A Boremax field engineer remains on-site throughout the installation, commissioning, and operator training process (up to four working days).

Day 1 — Operator Training

System operation and maintenance training.

Day 2 — Site Assessment

Verify site conditions before installation.

Day 3 — Installation Preparation

Prepare equipment and installation area.

Day 4 — Installation & Commissioning

Install, test, and verify system performance.

Get in touch

U.S.-Based Operations,
Field-Proven Design

Boremax leases and supports the system for operators across the United States. The underlying design has an operating history across multiple international basins, including high-sand and high-viscosity fields in Asia and evaluation programs with major operators, before being brought to the U.S. lease market.

  • (214) 555-0142

  • 1900 N. Akard St, Dallas, TX 75201

Boremax provides direct-drive artificial lift systems engineered for reliable, efficient oil and gas production. Our lease-based solution helps operators reduce energy consumption, simplify field operations, and keep wells producing.