Frequently Asked Questions (FAQs)

FAQ

Questions, Answered

How long does it take to get a lease quote?

Most lease quotes are returned within 24 hours of receiving your well details.

Do you sell Boremax, or only lease it?

We lease it. That means no large upfront equipment cost, and installation, training, and support are all part of the lease.

What can Boremax replace?

It's built to replace both Sucker Rod Pumps (SRP) and side-drive Progressive Cavity Pump (PCP) systems.

What's included in the lease?

The Main Unit, Control Cabinet, 15 meters of wiring, on-site installation and training, replacement parts, and remote monitoring support.

Do you support wells outside your home region?

Yes — we lease and support wells nationwide, and Boremax has a track record of installations across multiple countries.

Get in touch

U.S.-Based Operations,
Field-Proven Design

Boremax leases and supports the system for operators across the United States. The underlying design has an operating history across multiple international basins, including high-sand and high-viscosity fields in Asia and evaluation programs with major operators, before being brought to the U.S. lease market.

  • (214) 555-0142

  • 1900 N. Akard St, Dallas, TX 75201

Boremax provides direct-drive artificial lift systems engineered for reliable, efficient oil and gas production. Our lease-based solution helps operators reduce energy consumption, simplify field operations, and keep wells producing.

© 2026 Boremax. All Rights Reserved.